Quote follow-up for Las Vegas supply houses
Written for the counters on Valley View, Rainbow and Cameron. Why quotes go quiet at a supply house specifically, and what to do about it without buying anything.
Why the busiest shops are the slowest to reply — the short version, if you'd rather watch than read. Captions included.
A contractor calls your counter at 6:40 in the morning asking what you have in stock and what it'll run. Someone writes it up, sends a number, and gets pulled onto the next thing. Nobody looks at that quote again.
That's the whole failure. It isn't price and it usually isn't service. It's that at a supply house, the person in front of you always wins — and that's correct, that's the job. But it means the quiet requests have no owner.
Why supply houses have this worse than most
Every business loses quotes to silence. Supply houses lose more of them, for reasons specific to how the counter works:
- Your customers are on job sites. A contractor who asked at 6:40am is in a crawlspace by 9. They're not refreshing their inbox. If you reply at 2pm, you've reached a man who won't look until evening, by which point he's ordered from whoever answered first.
- Quoting is interrupt-driven. It happens between walk-ins, phone calls and deliveries. There's no moment in the day that belongs to follow-up.
- Nobody owns the request after it's sent. Whoever wrote it has moved on. There's no list, so there's no gap anyone can see.
- Your competitors are three miles away. In this valley a contractor has four or five places they could call. Speed is most of the difference between them.
The result: a stack of quotes that are neither won nor lost, sitting in a state nobody is tracking.
The three-touch routine
The fix is a schedule, not software. Three messages, fixed timing, then stop.
Touch 1 — next business day
Short. Confirms it landed, opens a door. Not a close.
"Hi Dave — sent that over yesterday on the 40 ball valves. Did it come through? Happy to adjust quantities if that count's off."
Touch 2 — day 4 or 5
Bring something new. Stock position and lead time are the two things that actually move a contractor.
"Hi Dave — got those in stock now, but that's the last of the run till February. Want me to hold them under your name a few days?"
Touch 3 — day 10 to 14
Close the loop and give them an easy out. This one gets replies precisely because it isn't asking for the order.
"Hi Dave — I'll assume this one's handled and get out of your inbox. Quote's good another two weeks if it comes back around. Appreciate you asking us."
Then stop. The fourth and fifth messages return almost nothing and cost you goodwill with someone you'll see again.
What to say, at a counter specifically
Lead with stock, not with price
A contractor who already has your number doesn't need it repeated. What changes their decision is whether you have it and when they can get it. "Still have these on the shelf" is a reason to write. "Just following up" isn't.
Use the part, not the quote number
"Following up on Q-10482" means nothing to a man on a roof. "Following up on the 40 ball valves" lets him answer without going to find anything.
Text the ones who text
Plenty of your customers would rather text than email, and a text gets read on a job site where an email doesn't. Match whatever channel they started in.
Offer to hold it
This is the supply house advantage nobody uses. A contractor deciding between you and a competitor three miles away will often pick whoever removed the risk of the material disappearing. Offering to set it aside is free and it closes jobs.
The best follow-up at a counter is boring, names the part, and can be read while walking across a yard.
Running it Monday morning
Zero spend, starts this week:
- One list. Whiteboard in the back or a free spreadsheet. Four columns: who, what, date sent, last touch.
- Two windows. Fifteen minutes Tuesday morning, fifteen Thursday afternoon. Repeating alarm on somebody's phone. That's follow-up time.
- Three saved messages. The templates above, saved once, filled in each time.
- One rule. Nothing leaves the list until it's a yes or a no. Silence is not a no.
Done every week, that beats any software, because software nobody opens follows up with nobody. The general version of this system is written up here.
When it's worth automating
The manual routine holds until one of these is true: you're sending more than roughly twenty quotes a week and Tuesday keeps getting away from you; more than one person quotes and nobody's sure who's chasing what; or you've caught yourself chasing the big ones and quietly dropping the small ones.
At that point the answer still isn't a CRM. It's something small that sits on the email and texting you already have, schedules the three touches, drafts them with the part and the name filled in, and holds them for someone to approve. A person reads it and taps send. Nobody learns new software, and the second message stops depending on whether anyone remembered.
That's what I set up, here in Las Vegas, and only messages you've approved ever go out. But run the schedule either way — that's the part that makes the money.
Common questions
- How long should a supply house wait to follow up on a quote?
- Send the first follow-up the next business day. Contractors are on job sites and decide fast, so a quote that sits for a week has usually already been lost to whoever replied first.
- What should I say in a follow-up to a contractor?
- Name the actual part rather than the quote number, lead with stock position and lead time rather than repeating the price, and offer to hold the material. Keep it to two or three sentences that can be read on a job site.
- Should I text or email contractors about quotes?
- Match the channel they used to contact you. Many contractors read texts on site and never open email until evening, so switching channels to seem more personal usually backfires.
- How many times should I chase a quote before giving up?
- Three. Next business day, day four or five, then once more at day ten to fourteen to close it out. Past three the reply rate drops sharply and you start damaging a relationship you'll need again.
- Do I need a CRM to do this at a supply house?
- No. A whiteboard or spreadsheet, two fifteen-minute windows a week, and three saved templates will cover most counters. Consider automating only when volume or the number of people quoting makes the routine stop happening.
Want a second opinion on your own setup?
I do a free 15-minute review for Las Vegas businesses. No pitch, no obligation — if automation isn't worth it for you, I'll say so.
Book a free 15-minute review